Speeches

Richard Burden – 2016 Parliamentary Question to the Department for Transport

The below Parliamentary question was asked by Richard Burden on 2016-03-17.

To ask the Secretary of State for Transport, what the schedule is for road works to establish a connected corridor from London to Dover; and what the projected end date is for establishing that corridor.

Andrew Jones

Timescales for delivery of the A2 M2 London to Dover Connected Vehicles Corridor remain indicative. Feasibility work is due to conclude in June 2016, after which detailed scheme design is programmed to complete during 2017. Between September 2017 and January 2019, infrastructure will be deployed at the roadside and, where possible on existing street furniture, to minimise disruption. These devices will connect wirelessly with a limited number of test vehicles. Evaluation will be ongoing during that period.

The programme is expected to report during 2018/19 on recommendations for future deployment.