PRESS RELEASE : The Wensum Link – What About Cycling? [August 2021]
The press release issued by the Norwich Cycling Campaign on 22 August 2021.
The proposed Wensum link, officially called the Norwich Western Link (NWL), is a plan to connect the A1270 Northern Distributer Road (NDR) from the point where it joins the A1067 Fakenham Road, across the Wensum valley on a viaduct, to join a newly-dualled A47 at Honingham. This is a very controversial road proposal. The Wensum valley is a Special Area of Conservation, a place of great natural beauty with wildlife-rich ancient woodlands and a beautiful chalk river, the Wensum. If built, the road will cause a huge – and frankly unforgivable – amount of damage to this delicate environment.
The position of Norwich Cycling Campaign (NCyC) is to oppose the project. Road building of this type is always detrimental to cycling, especially when fast dual carriageways sever existing roads radiating out from the city to the surrounding countryside. Also, because this road will enable development of suburban sprawl around the north-west of Norwich, it will inevitably increase car dependency creating a poorer environment for people wishing to get around by bike.
However, we recognise that huge commercial pressure will probably force its construction through. If this is to happen, it’s important that the proper cycling provision which appears to be guaranteed by government policy is actually honoured. Sadly, in this respect, it seems Norfolk County Council (NCC) are intent on doing all they can to cut corners by not providing a parallel cycle track at all.
The dual carriageway road will cross the valley on a huge viaduct and NCC are insisting no cycle track be incorporated into its construction. This is unacceptable as it means there will be no accommodation for cycle traffic along the new road. The viaduct cycle track is therefore the biggest issue facing NCyC because if it’s not included in the construction of the bridge it would be very difficult and expensive to add later.