Speeches

Lord German – 2015 Parliamentary Question to the Department for Transport

The below Parliamentary question was asked by Lord German on 2015-09-17.

To ask Her Majesty’s Government when the last major maintenance work was undertaken on the first and second Severn crossings, and what was the cost of that work.

Lord Ahmad of Wimbledon

In September 2013 Severn River Crossing Plc (SRC) carried out major refurbishment of the movement joint and structural connection between the Wye Bridge and the Beachley Viaduct on the M48 Crossing. The estimated cost to SRC of this work is £0.75m.

Since 2006, SRC has been repainting the steel truss of the cable stayed bridge on the M4 Second Severn Crossing. This work is programmed to be completed before the end of the concession and to date the estimated cost to SRC is £5.1m