To ask the Secretary of State for Defence, what plans the Government has to maintain its fleet of M3 Amphibious Rig bridging vehicles after the withdrawal of UK troops from Germany.
Mr Philip Dunne
38 M3 Amphibious Rigs have been in service with the British Army in each of the last six years. No additional rigs have been loaned from the German Army during that time. The planned out of service date for the M3 amphibious rig is 2027; early work is under way to provide a wide wet gap crossing capability in future. No decisions have yet been made about future basing sites for the M3 Amphibious Rig.
The following table shows the number of recorded equipment failure reports (EFR) in each of the last six years.
Calendar Year in which EFR recorded |
No of EFRs recorded in calendar year |
2010 |
16 |
2011 |
0 |
2012 |
5 |
2013 |
1 |
2014 |
4 |
2015 |
0 |