Daniel Zeichner – 2015 Parliamentary Question to the Department for Transport
The below Parliamentary question was asked by Daniel Zeichner on 2015-12-01.
To ask the Secretary of State for Transport, what steps he is taking to develop (a) a hydrogen vehicle refuelling network and (b) an electric vehicle network.
Andrew Jones
The Government recognises that having joined up refuelling and charging infrastructure is a prerequisite for the mass take up of hydrogen fuel cell electric vehicles together with battery electric and plug-in hybrid vehicles.
In October last year, the previous Government announced £11m for the Hydrogen for Transport Advancement Programme to support the roll-out of hydrogen fuel cell vehicles (FCEVs) and associated refuelling infrastructure. In March 2015 the successful bidders for funding to support an initial network of 12 hydrogen refuelling stations were announced – a significant first step towards the initial national network of 65 identified by the joint Government-industry UKH2Mobility project.
We are helping both motorists and local authorities with the upfront cost of purchasing and installing electric vehicle chargepoints with grant funding through our Electric Vehicle Homecharge and On Street Residential Schemes. As well as this, the Government is currently refreshing its strategy on how best to support the development of the wider public charging network which is now benefitting from significant levels of private sector investment. The UK now has one of the best rapid charging networks in Europe and £15m was committed in the 2014 Autumn Statement for Highways England to ensure drivers are never more than 20 miles from a chargepoint on the Strategic Road Network.