Speeches

Cheryl Gillan – 2016 Parliamentary Question to the Department for Transport

The below Parliamentary question was asked by Cheryl Gillan on 2016-01-19.

To ask the Secretary of State for Transport, if he will make a comparative assessment of the (a) cost of construction, (b) environmental effects and (c) construction time of High Speed 2 and a conventional electrified rail line along the High Speed 2 route.

Mr Robert Goodwill

A comparative assessment of the costs of construction and environmental effects of a High Speed and conventional electrified line was presented in the November 2013 HS2 Ltd report; London – West Midlands environmental Statement, Volume 5, Alternatives Report. The comparative assessment with a conventional line can be found from page 23 of the report which can be accessed online via

https://www.gov.uk/government/uploads/system/uploads/attachment_data/file/259616/Vol1_Alternatives_Report_CT-002-000_wm.pdf