Caroline Lucas – 2016 Parliamentary Question to the Department for Transport
The below Parliamentary question was asked by Caroline Lucas on 2016-06-13.
To ask the Secretary of State for Transport, if he will release a copy of the modelling analysis referred to in the GTR Remedial Plan, published on 12 February 2016, on the combined impact of the infrastructure restrictions at London Bridge, the diversion of Thameslink services and the increased use of London Victoria as a terminus on the punctuality and reliability of the network.
Claire Perry
The results of Network Rail’s modelling analysis of the combined impacts of changes to rail operations at London Bridge were discussed with rail operators and the Department for Transport. The Department does not, however, hold a copy of this analysis.