Baroness Wolf of Dulwich – 2016 Parliamentary Question to the Department for Transport

The below Parliamentary question was asked by Baroness Wolf of Dulwich on 2016-03-07.

To ask Her Majesty’s Government what proportion of the London cycle superhighways (1) under construction, and (2) proposed and out for consultation, are being built on red routes.

Lord Ahmad of Wimbledon

The London cycle superhighways are a matter for the Mayor and Transport for London (TfL). TfL have provided the following information:

Cycle superhighway Route

Status

Total Length

Length on Transport for London

% on Transport for London

(miles)

Road Network (“red routes”) (miles)

Road Network (“red routes”)

CS5i

Complete

0.87

0.87

100%

CS1

Under Construction

6.84

0.50

7%

CS2U

Under Construction

2.86

2.86

100%

CSNS Phase 1

Under Construction

1.62

1.49

92%

CSEW Phase 1

Under Construction

7.02

2.55

36%

CSNS Phase 2

Consultation

1.68

0.56

33%

CSEW Phase 2

Consultation

4.53

4.04

89%

CS11 Phase 1

Consultation

4.47

0.37

8%

Total

N/A

29.89

13.24

44%