Speeches

Adam Holloway – 2016 Parliamentary Question to the Department for Transport

The below Parliamentary question was asked by Adam Holloway on 2016-07-11.

To ask the Secretary of State for Transport, pursuant to the Answer of 23 May 2016 to Question 37232, what assessment his Department made of the potential vehicular capacity of the two long tunnel options for the Lower Thames Crossing connected either (a) through junctions 2 and 30 on the M25 or (b) by direct connection to the motorway beyond the junctions.

Andrew Jones

Both the long tunnel options between Darenth and South Ockenden would have a nominal capacity of approximately 8,000 vehicles per hour. In the morning peak hour at the year of opening in 2025, the (a) shorter tunnel option through junctions 2 and 30 on the M25 would have an initial forecast usage of 5,600 vehicles per hour and for (b) 3,400 for the longer beyond junction tunnel option.