To ask the Secretary of State for Energy and Climate Change, pursuant to the Answer of 15 October 2015 to Question 11023, how many developers are developing proposals at each of the sites referred to in that Answer; what indicative electricity strike rates have been discussed with those developers; and what (a) generating capacity and (b) potential timescales have been discussed with each developer in each case.
Andrea Leadsom
I set out the position below. It is too soon to say what any strike price might be for these projects.
Site |
Developer |
Proposed generating capacity |
Potential timescale for operation |
Wylfa |
Horizon |
2.7 GW |
mid-2020s |
Oldbury |
Horizon |
2.7 GW |
to be confirmed |
Moorside |
NuGen |
3.6 GW |
mid-2020s |
Sizewell |
EDF/CGN |
3.2 GW |
to be confirmed |
Bradwell |
EDF/CGN |
to be confirmed |