Speeches

Keir Starmer – 2015 Parliamentary Question to the Department for Transport

The below Parliamentary question was asked by Keir Starmer on 2015-10-09.

To ask the Secretary of State for Transport, when funds will be made available to enable the eastern section of the station at Euston to be redeveloped; and if he will ensure that this is developed as a level-deck station with platforms at the same levels as those for High Speed 2.

Mr Robert Goodwill

HS2 Ltd deposited an Additional Provision (AP3) to the HS2 Phase One hybrid Bill on 16 September 2015 which includes revised plans for London Euston station. The new plans focus on an incremental strategy which will deliver new high speed platforms (Stages A and B1) and do not preclude wider redevelopment of the existing station in the future (Stage B2).

The redevelopment of the existing station (Stage B2) will be subject to separate planning and funding decisions that will be made at an appropriate point in the process. Network Rail is preparing plans for the feasibility work of this redevelopment which will be submitted as part of its Control Period 6 (CP6) submission (which covers the period 2019-2024). These plans will consider the impacts of all options for station redevelopment including level-deck and split-level concourses and will include an assessment of the effects of this redevelopment, including the potential effects on local residents, businesses and rail users. The process will start with the Initial Industry Plan which is anticipated to be published in September 2016.